Crown Pillar Mining

Frontiers A Method for Multihole Blasting Seismic Wave

 · The crown and the barrier pillars were uniformly charged and blasted This fan shaped blast design had 55 rows and 992 blastholes in total The No 2 rock emulsion explosive was charged with 218 decks in total The total charge weight was 48396 kg in which the maximum charge weight of a single deck was 498 kg and 181746 t of ore would be exploited

Get Price

Mine Mining and Mine Surveying Basic Dictionary

Crown Pillars Horizontal pillars that run across a coal Road The main road s in a mining operation used for hauling coal or waste material from the mining area Heave The expansion of shot ground after a blast Headframe A steel structure built around a mine shaft for supporting winding systems cages and skips Heading A roadway or cross cut in an

Get Price

Crown pillar stability back analysis 1990 edition Open

 · Crown pillar stability back analysisPillaring Mining Ground control Mining Mining engineering Edit Crown pillar stability back analysis report to CANMET This edition was published in 1990 by Golder Associates Ltd in Mississauga Ont Edition Notes Supported by the Canada Centre for Mineral and Energy Technology CANMET Department of Energy Mines and

Get Price

A design philosophy for surface crown pillars of hard rock

Surface crown pillars acting to safely protect underground workers and operations from surface elements are recognized herein as distinct from conventional deeper underground pillars Moreover because of the variation in mining and geological conditions that exist from mine site to mine site each case is viewed as unique

Get Price

mining engineering Mine Layout

 · • A crown pillar of ore beneath the open pit is usually left in place while underground mining proceeds The height of the crown pillar in good ground is typically made equal to the maximum width of stopes to be mined immediately beneath When the overburden is too deep the ore body is not mined by open pit but a crown pillar is left in place of height the

Get Price

Rock Mechanics Approach for the Recovery of the Zone G

Xstrata Nickel Raglan Mine Rouyn Noranda Quebec Canada ABSTRACT The recovery of the Zone G crown pillar located between the bottom of the open pit and the top of the underground workings at the Raglan Katinniq Mine in Nunavik started in the summer of 2022 and should be completed by the end of 2022 This article describes the

Get Price

Vast Resources PLC Acquisition of Ghaghoo Diamond Mine ADVFN

 · A sinkhole caused by the partial collapse of a portion of the crown pillar possibly due to over mining covers an area on the first level of eight in the kimberlite pipe and limits the access to this particular zone of higher grade kimberlite Upper production levels will need to have reduced stope extraction so as to better manage the crown pillar and thereby reduce any

Get Price

v115n11a14 Rock engineering aspects of a modified mining

This was subsequently implemented at Crown Mines and ERPM The longwall layouts seemed to be largely successful except for large damaging seismic events that still occasionally occurred This was particularly problematic when mining through or in close proximity to geological structures and became worse as the mining depths increased A few years later stability pillars where introduced

Get Price

Ore Dilution & Recovery in Mining

 · Likewise some loss may be incurred in recovery of floor or crown pillars Loss in pillars may run up to 10 or 15 percent of the total ore in the deposit As in open stoping pillars may also be left at various horizons in the stope for roof support but the aim usually is to leave these in low grade sections as much as possible Some dilution almost always occurs in

Get Price

Rock mechanics of crown pillars between cut and fill

misc{etde 8489296 title = {Rock mechanics of crown pillars between cut and fill stopes at the Mount Isa mine} author = {Lee M F and Bridges M C } abstractNote = {At both levels the leading stopes experienced bad ground conditions due to high stresses in the stope s backs when the crown pillars were about 35 m high At 9 level cut and fill mining stopped and most of

Get Price

Technical papers Association of Mine Managers South

Aspects of the Seismic Response to Shaft Pillar Mining Case Studies in the Welkom Gold FieldAuthor Mr HW Unwin Manager Southern Section Crown Mines Ltd Construction of a Concrete Plug in the South Deep Main Shaft to seal off a major water intersection Author MF Wells Business Unit Manager Cementation Mining Extraction of 5 West Sub Vertical Shaft Pillar the Final Stages

Get Price

Casa Berardi Hecla Mining Company

 · The Company began producing ore from the East Mine Crown Pillar EMCP pit in July 2022 Located near the East mine the capital for this shallow pit project is expected to be $39 million over years The project has an expected IRR of 90% Visit Hecla Quebec to learn more Production Casa Berardi is an underground trackless mine accessed by declines and a shaft The mining

Get Price

Rock mechanics of crown pillars between cut and fill

At 9 level cut and fill mining stopped and most of the crown pillars were extracted by a slot and massfire method At 11 level cut and fill mining continued Shear displacement along bedding planes began within and around the crown pillars of the leading stopes at 11 level and spread through other crown pillars and to the hangingwall of the stoping system Destressing

Get Price

mining engineering Shaft Design

 · • The depth of shaft should be such as is able to develop 1 800 days mining of ore reserves Source Alan O Hara • The first lift for a near vertical ore body should be approximately 2 000 feet If the ore body outcrops the shaft will

Get Price

Prediction of surface crown pillar stability using

Xibing Li Diyuan Li Zhixiang Liu Guoyan Zhao Weihua Wang Determination of the minimum thickness of crown pillar for safe exploitation of a subsea gold mine based on numerical modelling International Journal of Rock Mechanics and Mining Sciences / 57 42 56 2022

Get Price

Environmental Registration Filed for Mining of Nugget Pond

Mining of Nugget Pond s Crown Pillar London England & Baie Verte Newfoundland and Labrador Rambler Metals and Mining plc TSXV RAB AIM RMM Rambler or the Company is pleased to announce that on December 20 2022 the Company officially submitted the environmental registration for the mining of the Nugget Pond Crown Pillar located less

Get Price

mining engineering Mine Layout

 · • A crown pillar of ore beneath the open pit is usually left in place while underground mining proceeds The height of the crown pillar in good ground is typically made equal to the maximum width of stopes to be mined immediately beneath When the overburden is too deep the ore body is not mined by open pit but a crown pillar is left in place of height the same as if it were If the

Get Price

Determination of the Optimum Crown Pillar Thickness

 · Conference Proceeding Bakhtavar E Oraee K & Shahriar K 2022 Determination of the Optimum Crown Pillar Thickness Between Open Pit and Block Caving In Proceedings 29th International Conference on Ground Control in Mining ICGCM Papers 29th International Conference on Ground Control in Mining Morgantown West ia USA

Get Price

C 3 Subsidence Analysis Report

thickness of the crown pillar by decreasing the top of mining elevation decreasing the number of stopes mined in the upper level to reduce the footprint of the crown pillar and mining the stopes in the upper level in stages and maximizing the tightness of backfill employed minimizing the vertical void beneath the crown pillar Details of the crown pillar stability assessment are

Get Price

Design of crown pillar thickness using finite element

These design charts can be used for the design of crown pillar thickness with the depth of the working taking into account the changes of the rock mass conditions in underground metal mine Keywords Cut and fill mining Crown pillar FEM Regression model Design char Topics Mining engineering Metallurgy TN1 997 Publisher Elsevier Year 2022 DOI identifier /

Get Price

Mine Mining and Mine Surveying Basic Dictionary

Crown Pillars Horizontal pillars that run across a coal Road The main road s in a mining operation used for hauling coal or waste material from the mining area Heave The expansion of shot ground after a blast Headframe A steel structure built around a mine shaft for supporting winding systems cages and skips Heading A roadway or cross cut in an underground

Get Price

Environmental Registration Filed for Mining of Nugget Pond

Mining of Nugget Pond s Crown Pillar London England & Baie Verte Newfoundland and Labrador Rambler Metals and Mining plc TSXV RAB AIM RMM Rambler or the Company is pleased to announce that on December 20 2022 the Company officially submitted the environmental registration for the mining of the Nugget Pond Crown Pillar located less than 150 metres away from its gold

Get Price

CPillar Easily analyze underground crown pillars

CPillar is a quick and easy to use tool for evaluating the stability of surface or underground crown pillars and laminated roof CPillar offers three different limit equilibrium analysis methods rigid plate analysis; elastic plate analysis; and Voussoir no tension plate Additionally users can choose between a Deterministic or Probabilistic analysis

Get Price

chibuluma south mine

In 2022 the company continued its survival plan through higher recoveries from crown pillar mining The company continues to stockpile this ore with theA Look at the Largest Copper Smelters · Located in Fengchengang an industrial area in the south of Guangxi China Jinchuan s copper smelter is capable of producing over million tons per year The Group operates mines at Ruashi Kinsenda in

Get Price

Agnico Eagle Mines Limited Operations Operations

Underground mining of the Santo Niño crown pillar began in late 2022 using long hole sublevel stoping from surface to extract ore and was completed in April 2022 — completing the transition of Pinos Altos from a combination surface and underground mine to a fully underground operation At the Sinter deposit located approximately 2 km northwest of the Pinos Altos mine site production

Get Price

A New Approach to Surface

View from MINING ENG SURFACE MI at Indian Institute of Technology Dhanbad A New Approach to Surface Crown Pillar Design Golder Associates Toronto

Get Price

Our Team MineGeoTech

BEng Mining Hons MEngSc Mining Geomechanics Pilar design including crown pillar sill pillar and in stope pillar assessments Raisebore analysis Writing of GCMP s and preparations for regulatory audits Richard has open pit experience in slope design and monitoring systems He also has experience with prefeasibility and feasibility studies for open pits His

Get Price

Stop Mining Method Mineral Processing & Metallurgy

 · The most common arrangement for stope mining in flat deposits is the room and pillar arrangement where the roof is supported by square or rectangular pillars on a more or less rectangular pattern The profitability of a room and pillar mine depends on optimization of the size and spacing of the pillars so that the greatest portion of coal can be removed without

Get Price

Underground metal mine crown pillar stability analysis

The open stope mining method is the most common underground extractive technique used in Australian metalliferous mines The crown pillar as it stands in the vertical plane between two open stopes is an integral part of the global stability of an underground metal mine The stability of crown pillars are significantly affected by the mechanical and physical properties of the rock mass

Get Price

A design philosophy for surface crown pillars of hard rock

Surface crown pillars acting to safely protect underground workers and operations from surface elements are recognized herein as distinct from conventional deeper underground pillars Moreover because of the variation in mining and geological conditions that exist from mine site to mine site each case is viewed as unique A review of numerous case studies and existing

Get Price

mining engineering Shaft Design

 · • The depth of shaft should be such as is able to develop 1 800 days mining of ore reserves Source Alan O Hara • The first lift for a near vertical ore body should be approximately 2 000 feet If the ore body outcrops the shaft will then be approximately 2 500 feet deep to allow for gravity feed and crown pillar

Get Price

Casa Berardi Hecla Mining Company

 · The Company began producing ore from the East Mine Crown Pillar EMCP pit in July 2022 Located near the East mine the capital for this shallow pit project is expected to be $39 million over years The project has an expected IRR of 90% Visit Hecla Quebec to learn more Production Casa Berardi is an underground trackless mine accessed by declines and a shaft The mining methods are

Get Price

An Update on the Scaled Span Concept for Dimensioning

As crown pillar design for most hard rock mines in the past had been arbitrary at best and random at worst based simply on leaving just one more round to surface some more logical method of surface crown pillar dimensioning was required Available Rules of Thumb and theoretical methods were evaluated and none were found capable of dealing

Get Price